8 MGD lime softening water treatment facility
General Contractor: Williams Brothers Construction
Services Utilized: Sandblasting, Painting, Zinc Coatings, Epoxy Floor Coatings, Epoxy/Urethane Steel Coatings
This project received a 2006 Special Achievement Award from the ACEC - Illinois
The need to meet federal potable water regulations required the City of West Chicago (IL) to develop new water treatment facilities in a short time frame. With the help of Custom Coatings Inc., time was not an issue in getting this very important water tratment plant up and running. The 100-year flood-rated facility will serve the city's 25,000 residents along with local businesses. When it comes to water treatment, no corners can be cut, as well as the condition of the facility. CCI's services, such as sandblasting and zinc coating, provide this facility with a quality finish, that is just as much functional as it is beautiful. The residents in west Chicago will never have to worry about impurities from paint finishing when being distributed from this plant.
